Blue Line Phase 2B: Hebbal-Yelahanka-Bagalur Cross Metro Update

North Bangalore's airport metro corridor moves closer to reality through Hebbal, Yelahanka and Bagalur Cross.

Discover More

Blue Line Phase 2B: Where Construction Stands at Hebbal, Yelahanka and Bagalur Cross

North Bangalore's long-awaited rail link to Kempegowda International Airport is inching forward, and the stretch through Hebbal, Yelahanka and Bagalur Cross is where much of the current activity is concentrated. The Blue Line's Phase 2B extends from KR Puram to the airport with key stations including Hebbal, Yelahanka and Bagalur Cross, and it forms the second half of a 58.19-km corridor that will eventually give the city its first direct metro link to the airport.

Recent site inspections by Bangalore Metro Rail Corporation Limited (BMRCL) leadership underline the pace of work on this stretch. BMRCL Managing Director J Ravishankar inspected the ongoing construction on the Blue Line from Kempegowda International Airport to Hebbal, with the review covering viaduct construction, station buildings, and the upcoming depot at Shettigere. He also reviewed high-priority locations such as railway crossings and cut-and-cover sections near the Indian Air Force premises, instructing engineers and contractors to strictly adhere to target completion dates while maintaining safety protocols.

At the Hebbal end of the corridor, which functions as a critical interchange point, construction has entered an advanced phase, with most viaduct work along the Hebbal flyover stretch nearing completion. Hebbal is being developed as a major multi-modal hub since the Blue Line here will eventually connect to the proposed Orange and Red Lines, making it one of the busiest junctions on the future Namma Metro network. Further along the alignment, the depot works at Shettigere - where Blue Line trains will be serviced - have been progressing at a satisfactory pace, with land acquisition for the depot already completed.

Despite this momentum, Phase 2B has not been immune to delays. Industry trackers note that while Phase 2A trial runs are underway, Phase 2B between KR Puram and the airport is still facing delays due to land acquisition issues, utility shifting, and slower construction progress in certain sections. The airport line's revised target has moved to early 2027, a shift from earlier projections, reflecting the complexity of building through built-up urban stretches like Hebbal alongside greenfield sections near the airport.

For homebuyers and investors tracking the corridor, the station list matters as much as the timeline. Phase 2B is expected to cover stations such as Nagawara, Kempapura, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka, Bagalur Cross, Bettahalasuru, Doddajala, Airport City and the KIAL Terminals stop, stitching together established residential belts with the fast-developing Aerospace Park and airport catchment. Once operational, this stretch is expected to cut travel time between the city and the airport dramatically compared to current road journeys.

The anticipation around this connectivity is already visible in real estate trends. Property values near stations like Yelahanka's Kogilu Cross and Bagalur Cross have reportedly risen by roughly 15-20% in recent project launches, as buyers price in the eventual metro access. Brigade Group, which has an established presence in this catchment through projects in Yelahanka and Hebbal, has continued to expand its North Bangalore portfolio, with recent launches in the ₹13,800-15,400 per sq ft range reflecting the premium positioning these micro-markets now command as the corridor progresses.

For now, the practical takeaway for anyone evaluating a home along this stretch is to track construction milestones rather than headline dates alone - viaduct completion at Hebbal, depot progress at Shettigere, and station finishing works at Yelahanka are the tangible markers of how close the airport link really is. As BMRCL continues its phased trials and inspections through 2026, the Hebbal-Yelahanka-Bagalur Cross stretch remains one of the most closely watched sections of Bengaluru's expanding metro map.

BRIGADE Projects

BRIGADE Secunderabad
Acquisition

BRIGADE Secunderabad

Secunderabad, Hyderabad, Telangana

3, 4 BHK (expected) • Price on request

₹650 Cr GDV project on 2.25 acres

BRIGADE BAIN CAPITAL WHITEFIELD ITPL MIXED-USE DEVELOPMENT
Upcoming

BRIGADE BAIN CAPITAL WHITEFIELD ITPL MIXED-USE DEVELOPMENT

Whitefield, Bangalore

Grade A Office | 5-Star Hotel • Investment ₹2,200 Cr

2 million sq ft mixed-use JV with Bain Capital

BRIGADE BOGADI ROAD
Upcoming

BRIGADE BOGADI ROAD

Bogadi Road, Mysuru

2, 3 BHK • Price on Request

10.9-acre Brigade address near Outer Ring Road

Brigade ECR Resort
Upcoming

Brigade ECR Resort

East Coast Road (ECR), Chennai

Guest Rooms, Suites • Price on request

250-room beachfront resort by Brigade

BRIGADE GRAND HYATT CHENNAI ECR
Upcoming

BRIGADE GRAND HYATT CHENNAI ECR

East Coast Road (ECR), Chennai

200 Keys • Price on Request

Beachfront Grand Hyatt hospitality landmark

BRIGADE INDUSTRIAL PARK
Upcoming

BRIGADE INDUSTRIAL PARK

Devanahalli, Bangalore

Built-to-Suit | IT/ITES | Data Centre • Price on Request

25-acre industrial park, ~2 million sq ft

BRIGADE JW MARRIOTT CHENNAI OMR
Upcoming

BRIGADE JW MARRIOTT CHENNAI OMR

Perungudi, Chennai

250 Guest Rooms & Suites • On Request

9-acre OMR mixed-use hospitality development

Brigade Neopolis Four-Acre Project
Upcoming

Brigade Neopolis Four-Acre Project

Kokapet, Hyderabad

3, 4 BHK • Price on request

4-acre upcoming project in Neopolis

Reach Out

We'd Love to Hear From You

Back

Questions You Might Have

What is Blue Line Phase 2B and which areas does it cover?
Phase 2B is the airport-link section of Namma Metro's Blue Line, running from KR Puram to Kempegowda International Airport via stations including Hebbal, Kodigehalli, Yelahanka, Bagalur Cross, Doddajala and Airport City.
When is Blue Line Phase 2B expected to open?
Targets have shifted over time; recent reports point to an early-to-mid 2027 opening for the Hebbal-Yelahanka-Airport stretch, following Phase 2A's trial runs which are slated to start around October 2026.
Why has the Phase 2B timeline been revised?
Progress on this stretch has faced delays linked to land acquisition, utility shifting, and construction pace in certain sections, pushing the airport line's working deadline to early 2027 according to BMRCL officials.
How will the Blue Line benefit Hebbal and Yelahanka residents?
The line will give these fast-growing North Bangalore suburbs their first direct metro connection, with Hebbal also emerging as a multi-modal interchange linking to the future Orange and Red Lines.
Where is the Blue Line depot located?
The depot for Blue Line trains is being built at Shettigere, near the airport end of the corridor, with land acquisition already completed and construction reported to be progressing well.
Has the metro construction affected property prices near Yelahanka?
Yes, anticipation of metro access has already pushed up property values near stations like Kogilu Cross and Bagalur Cross by an estimated 15-20% in some recent project launches.
Will Blue Line Phase 2B connect directly to the airport terminal?
Yes, the corridor's final station, KIAL Terminals, is planned as a partially underground stop that will offer a direct metro link into the airport, removing the need for a road transfer.
Is Phase 2A opening before Phase 2B?
Yes, Phase 2A from Central Silk Board to KR Puram is further along, with trial runs expected around October 2026, while Phase 2B to the airport is targeted for a later, 2027 opening.
Which other metro lines will intersect the Blue Line near Hebbal?
Hebbal is planned as an interchange for the future Orange Line, while nearby Kempapura and other points along the corridor are expected to connect with the proposed Red Line, making this a key network hub.
Should homebuyers wait for the metro to open before purchasing in this belt?
Most brokers and market trackers suggest early entry captures price appreciation before the corridor becomes fully operational, since values in comparable Bengaluru metro corridors have historically risen ahead of actual opening.

We share this information warmly and in good faith, as a guide only and not as an offer. Details including pricing, plans, and images may change over time. Please confirm everything with us before taking any step. About · Projects